St. Nikola an der Donau, Oberösterreich, Österreich
All weather
This structure with 7 arches was built between 1906 and 1909 in the course of railway construction. It is the highest overpass of the Danube bank railway from Vienna to St. Valentin. The local railway from Krems to Grein was opened in 1909.
Please click on the button "Create PDF now" to generate the document.
Loading...
Thank you for your interest, we are generating the document for you. This may take a while. Once the PDF has finished loading, it will open in a new window. The pop-up blocker of your browser should be disabled for our site.
Please let us know how we can improve the quality of this object or if there is any incorrect information on this page (eg. opening hours, contact, etc.).