Construction: landing stage River-km/Bank: 21868,03 / left Berths: 50 Slip facility: yes Infrastructure: electricity, water Sanitary equipment: public toilets at the nearby restaurant (80m) Catering: restaurant, in the village Other: harbour operating times: 01.05.-15.10.; 8 km to St. Marti
Please click on the button "Create PDF now" to generate the document.
Loading...
Thank you for your interest, we are generating the document for you. This may take a while. Once the PDF has finished loading, it will open in a new window. The pop-up blocker of your browser should be disabled for our site.
Please let us know how we can improve the quality of this object or if there is any incorrect information on this page (eg. opening hours, contact, etc.).